Our Projects

2014

LED Replacement Program

MB Hydro

Converted streetlights in the City of Winnipeg from MPS to LED.

2017

Symington Yard Upgrade

CN Rail

2019

Storm Restoration

MB Hydro

Dispatched a team of lineman to assist in power restoration to rural Manitoba communities after a historic Thanksgiving storm that left many communities with no power.

High Voltage Installation

CNL

Installed a single circuit 5kv pole line.

2020

Service Upgrade

Assiniboine Park

Upgrade of Assiniboine Park Conservancy’s existing 4160V system to 25kV including installation of pad-mount transformers, vista switchgear, underground cable and conduit, testing and commissioning of newly installed plant.

Substation Installation

Merit Foods

Installation of a 66 kV to 25 kV HVPT Substation at the Merit Functional Foods Corporation’s new processing plant

Electrical Upgrades

Government of Manitoba, Fish Hatchery

Supply and install up to twelve medium pressure Hydro-Optic UV Systems

Flood Pump Station Upgrade

City of Winnipeg

2021

Service Upgrade

Assiniboine Park

Upgrade of Assiniboine Park Conservancy’s existing 4160V system to 25kV including installation of pad-mount transformers, vista switchgear, underground cable and conduit, testing and commissioning of newly installed plant.

Street Renewals

Bituminex/Bayview

Traffic Signals – Installation of underground conduit, concrete bases, and associated vaults for various intersections within the City of Winnipeg.

Streetlights – Installation of underground conduit, streetlight cable, concrete bases, poles, and luminaires.

Track Protection Services

Ledcor

Supply of qualified Flagmen and HiRail equipment to support safe operations when working within track right of way.

Fiber Upgrades

Manitoba Hydro

Installation of overhead and underground fiber plant including lashing, underground conduit, vaults, pedestals, OH splice boxes in various locations within the Province of Manitoba.

High Voltage Re-Servicing

Manitoba Hydro

A total of 35kms 66kV sub-transmission and 25kV distribution line upgrades including installation of poles, cross arms, insulators, transformers and associated hardware, stringing of the conductor, tensioning of the conductor and tie-in to Manitoba Hydro’s existing energized or de-energized system.

Snow Removal

Multi-year contract to supply experienced operators and equipment such as Loaders, Backhoes, Skid Steers, etc. for snow removal services within City of Winnipeg.

Signals CTC and 7200 Upgrade

CN Rail

Install 7200V primary distribution equipment, underground fiber, and signal crossing upgrades for 53 miles along track.

Ground Rod Testing

Manitoba Hydro

Testing, installation, and connection of grounding electrodes on the 66kV-and-below electric distribution system throughout the Province of Manitoba.

Sprague Fibre Upgrades

CN Rail

Installation of underground fiber plant via Horizontal boring and ploughing for a total of 21 miles along track.

2022

Rural Manitoba Fibre Installation

Ledcor

Over 12 kms of underground fiber plant installation via horizontal boring to upgrade fiber networks within rural areas of Manitoba.